<item>
<title><![CDATA[E&amp;FM Yard Workshop Gents Toilet (051) - Updated Refurbishment Works  - 21 September 2026 - 30 November 2026]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p><strong>Updated programme:</strong></p>
<p>Gents Toilets Refurbishment Works E&amp;FM Yard Near Woodwork Shop Building.</p>
<p>A soft start will take place from 21 September to allow for contractor mobilisation, site set-up and initial preparatory works.</p>
<p>The refurbishment works will then progress in accordance with the agreed programme.</p>
<p><strong>Access arrangements:</strong></p>
<p>While the works are in progress, the <strong>nearby vehicle entrance barrier at Spinney Hill Drive will be closed</strong> to facilitate safe electrical working and contractor operations associated with the project.</p>
<p>Further updates will be provided as the works progress.</p>
<p><strong>TIMESCALE</strong></p>
<p>Monday 21 September to 30 November 2026.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title: Spencer Aryeetey, Building Fabric Surveyor</p>
<p>Mobile: 07977 004475</p>
<p>Email: &nbsp;s.aryeetey@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/efm-yard-gents-toilet---update-interior-construction-works---21-september-2026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/efm-yard-gents-toilet---update-interior-construction-works---21-september-2026.html</guid>
<pubDate>Fri, 18 Sep 2026 14:10:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Charnwood (055) Garendon (056) - Quarterly Fire Alarm Maintenance 4/4 - 28/9/26-2/10/26.]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>This is the fourth fire alarm visit for the testing year (October 2025 &ndash; September 2026) set out by the University's schedule, and requires a visit of silent testing.</p>
<p>This is where a selection of input devices around the building(s) will be activated silently. This will not activate any outputs on the system. BTS will regularly monitor the system for any real fires and raise the alarm if necessary.</p>
<p>An eighth of the system will be isolated at a time whilst BTS work their way around the building.&nbsp;</p>
<p>Once this notice has been sent, access will be assumed to have been granted to BTS for the dates/times mentioned below UNLESS we are contacted prior to the date/time in question with at least three days' notice.</p>
<p><strong>TIMESCALE</strong></p>
<p><strong>28.09.26 - 02.10.26</strong></p>
<p>Charnwood Garendon &ndash; 07:30 &ndash; 16:00 Every Day.</p>
<p>Intention:</p>
<p>Core A &ndash; D and associated inner cores &ndash; Monday 28<sup>th</sup></p>
<p>Core E &ndash; H and associated inner cores &ndash; Tuesday 29<sup>th</sup></p>
<p>Core M &ndash; P and associated inner cores &ndash; Wednesday 30<sup>th</sup></p>
<p>Core J &ndash; L and associated inner cores &ndash; Thursday 1<sup>st</sup></p>
<p>Various missed &ndash; Friday 2<sup>nd</sup></p>
<p>Charnwood Garendon &ndash; 07:30 &ndash; 16:00 Every Day.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title: Edward Roe. Fire Alarm Engineer for BTS.</p>
<p>Mobile: 07884 237879.</p>
<p>Email: &nbsp;Edward@buildingtechnologyservices.co.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/charnwoodgarendon-5556---quarterly-fire-alarm-maintenance---28926-21026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/charnwoodgarendon-5556---quarterly-fire-alarm-maintenance---28926-21026.html</guid>
<pubDate>Wed, 16 Sep 2026 10:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Quarterly Fire Alarm Maintenance 4/4 - Sport Park (081) - ATIC (220) - Holywell Building (058) - 23rd-25th Sept 2026.]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>This is the fourth fire alarm visit for the testing year (October 2025 &ndash; September 2026) set out by the University's schedule, and requires a visit of silent testing preceded (or followed) by <strong>LIVE TESTING</strong> which will involve activating <strong>all sounders and fire interfaces in the building(s)</strong>.</p>
<p>During the <strong>LIVE TESTING</strong>, all sounders will be activated. BTS will be wearing ear defenders, but cannot supply them to all the occupiers of the buildings. The building does not need to be evacuated, but can be if the occupiers so wish. All interfaces will be activated which mostly (but not limited to) action BMS links and door closures. There can be no exceptions due to the requirements of the tests. The alarms should be assumed to be activated for a period of up to <strong>15 minutes</strong> from the time stated below (in brackets) unless <strong>otherwise stated</strong>.</p>
<p>BTS can make no guarantees that we will be able to get plant back online as soon as the test is finished but we can contact FM to assist where required.</p>
<p>A period of silent testing will follow (or precede) this where a selection of input devices around the building(s) will be activated silently. This will not activate any outputs on the system. BTS will regularly monitor the system for any real fires and raise the alarm if necessary.</p>
<p>Once this notice has been sent, access will be assumed to have been granted to BTS for the dates/times and activations mentioned below UNLESS we are contacted prior to the date/time in question with at least three days' notice.</p>
<p><strong>TIMESCALE</strong></p>
<p><strong>23.9.26</strong></p>
<p>SportPark &ndash; 07:30 &ndash; 16:00 &ndash; Alarms 07:30 &ndash; 08:00</p>
<p><strong>24.9.26</strong></p>
<p>ATIC &ndash; 07:30 &ndash; 10:00 &ndash; Alarms 07:30 &ndash; 08:00</p>
<p><strong>25.9.26</strong></p>
<p>Holywell Building - 07:30 &ndash; 16:00 &ndash; Alarms 07:30 &ndash; 08:00</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title: Edward Roe. Fire Alarm Engineer for BTS.</p>
<p>Mobile: 07884 237879.</p>
<p>Email: &nbsp;Edward@buildingtechnologyservices.co.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/multiple-buildings---quarterly-fire-alarm-maintenance---23rd-25th-sept-2026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/multiple-buildings---quarterly-fire-alarm-maintenance---23rd-25th-sept-2026.html</guid>
<pubDate>Wed, 16 Sep 2026 09:45:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Fire Door Inspection -Elite Athletes Building (753) - Butler Court A (543) - 14 September to 30 October 2026]]></title>
<description><![CDATA[<h3>Description of the Works&nbsp;</h3>
<p><strong>WHY DOES THE WORK NEEED TO BE DONE</strong></p>
<p>The work needs to be done to ensure fire safety compliance within university buildings.</p>
<p><strong>HOW WILL THE WORKS AFFECT ME?</strong></p>
<p>The RLB Contractors will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to receptions where applicable prior to carrying out the inspections in each building.&nbsp;Elite Athletes Building</p>
<p>&nbsp;Elite Athletes Building-(753)</p>
<p>&nbsp;Butler Court A - (543)</p>
<p><strong>Timescale</strong></p>
<div jsuid="zDqeqe_3" class="qJYHHd mp0vvc" data-xid="aim-mars-turn-root" jsmodel="TqqUIc" data-asrc="true">
<div jsname="RH7zg" jsmodel="CPTaDd LUQCCe pRMv2d" data-tr-rsts="false" class="tonYlb Uphzyf" data-sfc-cp="" jsaction="" jscontroller="ZA09ef" data-sfc-root="c" jsuid="zDqeqe_4e" data-wiz-uids="zDqeqe_4f" data-sfc-cb="" data-streaming-container="" eid="f3XXafSwGa2dhbIPk5iesQ0">
<div data-processed="true">
<div class="CKgc1d" data-scope-id="turn" jsname="CS7uPe" jsmodel="p9hQFe CPTaDd LUQCCe wuVnCd pRMv2d" jsaction="" jscontroller="uUCgYd" data-sfc-root="c" jsuid="paZN7d_0" data-sfc-cb="" data-processed="true" data-complete="true">
<div data-subtree="aimc" decode-data-ved="1" data-sfc-cp="" jsaction="" jscontroller="v48bt" data-sfc-root="c" jsuid="paZN7d_2" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ2O0OegYIAQgAEAA" data-hveid="CAEIABAA" data-processed="true" data-complete="true">
<div jsuid="paZN7d_1" class="Zkbeff" jsaction="rcuQ6b:&amp;paZN7d_1|npT2md" jscontroller="nfCumd" data-sfc-root="c" data-wiz-uids="paZN7d_3" data-sfc-cb="" data-processed="true" data-complete="true">
<div class="pWvJNd" jsaction="" jscontroller="zp3Dsd" data-sfc-root="c" jsuid="paZN7d_4" data-sfc-cb="" data-processed="true" data-complete="true">
<div jsuid="paZN7d_5" dir="ltr" data-container-id="main-col" data-xid="VpUvz" jsname="KFl8ub" class="mZJni Dn7Fzd" jsaction="" jscontroller="Aoijq" data-sfc-root="c" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ3KYQegYIAQgAEAE" data-processed="true">
<div jsuid="paZN7d_12" data-xid="Gd7Hsc" data-sfc-cp="" jsaction="aimRenderComplete:&amp;paZN7d_12|FJEdde;rcuQ6b:&amp;paZN7d_12|npT2md" jscontroller="a5f0he" data-sfc-root="c" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="DBd2Wb" jsmodel="Qdu94e" data-complete="true" data-processed="true">
<div class="zkL70c" data-processed="true">
<div jsuid="paZN7d_14" class="RkJvxe" jsaction="rcuQ6b:&amp;paZN7d_14|npT2md" jscontroller="RU9mjc" data-sfc-root="c" data-wiz-uids="paZN7d_15" data-sfc-cb="" data-complete="true" data-processed="true">
<div jsuid="paZN7d_16" class="YHsVn" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_16|npT2md" jscontroller="nqTR2b" data-sfc-root="c" data-wiz-uids="paZN7d_17,paZN7d_18" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="" data-processed="true">
<p>From 14/9/26 to 30/10/26 Fire doors inspections will take place in the buildings above between, 9.00am -5.00pm.</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>: Rod Harrison - Fire Compliance Contract Supervisor</p>
<p><strong>Mobile</strong>: 07729080155</p>
<p><strong>Email</strong>: &nbsp;<a href="mailto:r.m.harrison@lboro.ac.uk">r.m.harrison@lboro.ac.uk</a></p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--elite-athletes-building--butler-court-1409--30102026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--elite-athletes-building--butler-court-1409--30102026.html</guid>
<pubDate>Thu, 10 Sep 2026 13:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Fire Door Inspection- David Collett Blocks A to F - 14/9/26 to 30/10/26.]]></title>
<description><![CDATA[<h3>Description of the Works&nbsp;</h3>
<p><strong>WHY DOES THE WORK NEEED TO BE DONE</strong></p>
<p>The work needs to be done to ensure fire safety compliance within university buildings.</p>
<p><strong>HOW WILL THE WORKS AFFECT ME?</strong></p>
<p>The RLB Contractors will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to receptions where applicable prior to carrying out the inspections in each building.</p>
<p>David Collett Block A (533)</p>
<p>David Collett Block B (534)</p>
<p>David Collett Block C (535)</p>
<p>David Collett Block D (536)</p>
<p>David Collett Block E (537)</p>
<p>David Collett Block F (538)</p>
<p><strong>Timescale</strong></p>
<div jsuid="zDqeqe_3" class="qJYHHd mp0vvc" data-xid="aim-mars-turn-root" jsmodel="TqqUIc" data-asrc="true">
<div jsname="RH7zg" jsmodel="CPTaDd LUQCCe pRMv2d" data-tr-rsts="false" class="tonYlb Uphzyf" data-sfc-cp="" jsaction="" jscontroller="ZA09ef" data-sfc-root="c" jsuid="zDqeqe_4e" data-wiz-uids="zDqeqe_4f" data-sfc-cb="" data-streaming-container="" eid="f3XXafSwGa2dhbIPk5iesQ0">
<div data-processed="true">
<div class="CKgc1d" data-scope-id="turn" jsname="CS7uPe" jsmodel="p9hQFe CPTaDd LUQCCe wuVnCd pRMv2d" jsaction="" jscontroller="uUCgYd" data-sfc-root="c" jsuid="paZN7d_0" data-sfc-cb="" data-processed="true" data-complete="true">
<div data-subtree="aimc" decode-data-ved="1" data-sfc-cp="" jsaction="" jscontroller="v48bt" data-sfc-root="c" jsuid="paZN7d_2" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ2O0OegYIAQgAEAA" data-hveid="CAEIABAA" data-processed="true" data-complete="true">
<div jsuid="paZN7d_1" class="Zkbeff" jsaction="rcuQ6b:&amp;paZN7d_1|npT2md" jscontroller="nfCumd" data-sfc-root="c" data-wiz-uids="paZN7d_3" data-sfc-cb="" data-processed="true" data-complete="true">
<div class="pWvJNd" jsaction="" jscontroller="zp3Dsd" data-sfc-root="c" jsuid="paZN7d_4" data-sfc-cb="" data-processed="true" data-complete="true">
<div jsuid="paZN7d_5" dir="ltr" data-container-id="main-col" data-xid="VpUvz" jsname="KFl8ub" class="mZJni Dn7Fzd" jsaction="" jscontroller="Aoijq" data-sfc-root="c" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ3KYQegYIAQgAEAE" data-processed="true">
<div jsuid="paZN7d_12" data-xid="Gd7Hsc" data-sfc-cp="" jsaction="aimRenderComplete:&amp;paZN7d_12|FJEdde;rcuQ6b:&amp;paZN7d_12|npT2md" jscontroller="a5f0he" data-sfc-root="c" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="DBd2Wb" jsmodel="Qdu94e" data-complete="true" data-processed="true">
<div class="zkL70c" data-processed="true">
<div jsuid="paZN7d_14" class="RkJvxe" jsaction="rcuQ6b:&amp;paZN7d_14|npT2md" jscontroller="RU9mjc" data-sfc-root="c" data-wiz-uids="paZN7d_15" data-sfc-cb="" data-complete="true" data-processed="true">
<div jsuid="paZN7d_16" class="YHsVn" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_16|npT2md" jscontroller="nqTR2b" data-sfc-root="c" data-wiz-uids="paZN7d_17,paZN7d_18" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="" data-processed="true">
<p>From 14/9/26 to 30/10/26 Fire doors inspections will take place in the buildings above between, 9.00am -5.00pm.</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>: Rod Harrison - Fire Compliance Contract Supervisor</p>
<p><strong>Mobile</strong>: 07729080155</p>
<p><strong>Email</strong>: &nbsp;<a href="mailto:r.m.harrison@lboro.ac.uk">r.m.harrison@lboro.ac.uk</a></p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--david-collett-blocks-a-to-f---14926-to-301026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--david-collett-blocks-a-to-f---14926-to-301026.html</guid>
<pubDate>Wed, 09 Sep 2026 13:15:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Fire Damper Annual Inspection and Service- Royce 20 (471) - Royce 22 (473) 07/09/2026 to 30/09/2026]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>&nbsp;</p>
<p>Royce Block 20 (471)</p>
<p>Royce Block 22 (473)</p>
<p>&nbsp;</p>
<p><strong>WHY DOES THE WORK NEEED TO BE DONE:</strong></p>
<p>The work needs to be done to ensure fire safety within University buildings.</p>
<p><strong>&nbsp;</strong><strong>HOW WILL THE WORKS AFFECT ME?</strong></p>
<p>The contractor (Rock Compliance Ltd) will be working in various locations around the building, so please observe any barriers and warning signs.&nbsp; The disruption is expected to be minimal; the contractor has been asked to report to reception where applicable, prior to carrying out the inspections in each building.</p>
<p><strong>TIMESCALE </strong></p>
<p>7 September to 30 September 2026</p>
<p>Fire Damper inspections will take place in the buildings above between&nbsp; 9.00 a.m. and 5.00 p.m. (Monday to Friday only).</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title: Fire Compliance Contract Supervisor</p>
<p>Mobile: 07729080155</p>
<p>Email: <a href="mailto:r.m.harrison@lboro.ac.uk">r.m.harrison@lboro.ac.uk</a></p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-damper-annual-inspection--service-07092026-30092026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-damper-annual-inspection--service-07092026-30092026.html</guid>
<pubDate>Thu, 03 Sep 2026 17:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Electrical Testing and Small Works-Wolfson Building (027)- Wolfson Annex (050)-Wolfson School of Mechanical and Manufacturing Engineering (065) -21/09/2026-21/11/2026]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>&nbsp;</p>
<p>Wolfson Annex (050)</p>
<p>Wolfson Building (027)</p>
<p>Wolfson School of Mechanical and Manufacturing Engineering (065)</p>
<p>&nbsp;</p>
<p>Electrical Testing of all electrical circuits within the building. Over the duration of the works all circuits will be turned off 1 at a time to carry out tests, each circuit will be off for no more than 20 minutes per circuit. This will mean lighting and power supplies will be affected for short durations of time.&nbsp; Full testing and inspection of the electrical installation is required to comply with The Electricity at Work Regulations 1989.</p>
<p>&nbsp;</p>
<p><strong>TIMESCALE </strong></p>
<p>21 September to 21 November 2026</p>
<p>&nbsp;</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title: Michael Wraight, Electrical Contracts Supervisor</p>
<p>Mobile: 07895 331913</p>
<p>Email: m.wraight@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/electrical-testing-and-small-works--wolfson-21092026-21112026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/electrical-testing-and-small-works--wolfson-21092026-21112026.html</guid>
<pubDate>Wed, 02 Sep 2026 15:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Electrical Testing and Small Works- Holywell Farmhouse (214)- Holywell Farm Buildings (218) 21/09/2026-21/11/2026]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>&nbsp;</p>
<p>Holywell Farmhouse (214)</p>
<p>Holywell Farm Buildings (218)</p>
<p>&nbsp;</p>
<p>Electrical Testing of all electrical circuits within the building. Over the duration of the works all circuits will be turned off 1 at a time to carry out tests, each circuit will be off for no more than 20 minutes per circuit. This will mean lighting and power supplies will be affected for short durations of time.&nbsp; Full testing and inspection of the electrical installation is required to comply with The Electricity at Work Regulations 1989.</p>
<p>&nbsp;</p>
<p><strong>TIMESCALE </strong></p>
<p>21 September to 21 November 2026</p>
<p>&nbsp;</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title: Michael Wraight, Electrical Contracts Supervisor</p>
<p>Mobile: 07895 331913</p>
<p>Email: m.wraight@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/electrical-testing-and-small-works-21092026-21112026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/electrical-testing-and-small-works-21092026-21112026.html</guid>
<pubDate>Wed, 02 Sep 2026 13:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Pilkington Library (030) - Installation of Microwave Station - 03 September - 18 September 2026
]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Supply and install a new unit, including 100mm laminated side panels, a 60mm bullnosed worktop, top boxing with removable access panel and integrated LED strip lighting. Provide removable 18mm MFC rear panels above and below the worktop, together with two flush-mounted sockets, one flush-mounted extraction hood and two microwaves. Supply and fit new grey vinyl flooring.</p>
<p><strong>Timescale</strong></p>
<div jsuid="zDqeqe_3" class="qJYHHd mp0vvc" data-xid="aim-mars-turn-root" jsmodel="TqqUIc" data-asrc="true">
<div jsname="RH7zg" jsmodel="CPTaDd LUQCCe pRMv2d" data-tr-rsts="false" class="tonYlb Uphzyf" data-sfc-cp="" jsaction="" jscontroller="ZA09ef" data-sfc-root="c" jsuid="zDqeqe_4e" data-wiz-uids="zDqeqe_4f" data-sfc-cb="" data-streaming-container="" eid="f3XXafSwGa2dhbIPk5iesQ0">
<div data-processed="true">
<div class="CKgc1d" data-scope-id="turn" jsname="CS7uPe" jsmodel="p9hQFe CPTaDd LUQCCe wuVnCd pRMv2d" jsaction="" jscontroller="uUCgYd" data-sfc-root="c" jsuid="paZN7d_0" data-sfc-cb="" data-processed="true" data-complete="true">
<div data-subtree="aimc" decode-data-ved="1" data-sfc-cp="" jsaction="" jscontroller="v48bt" data-sfc-root="c" jsuid="paZN7d_2" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ2O0OegYIAQgAEAA" data-hveid="CAEIABAA" data-processed="true" data-complete="true">
<div jsuid="paZN7d_1" class="Zkbeff" jsaction="rcuQ6b:&amp;paZN7d_1|npT2md" jscontroller="nfCumd" data-sfc-root="c" data-wiz-uids="paZN7d_3" data-sfc-cb="" data-processed="true" data-complete="true">
<div class="pWvJNd" jsaction="" jscontroller="zp3Dsd" data-sfc-root="c" jsuid="paZN7d_4" data-sfc-cb="" data-processed="true" data-complete="true">
<div jsuid="paZN7d_5" dir="ltr" data-container-id="main-col" data-xid="VpUvz" jsname="KFl8ub" class="mZJni Dn7Fzd" jsaction="" jscontroller="Aoijq" data-sfc-root="c" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ3KYQegYIAQgAEAE" data-processed="true">
<div jsuid="paZN7d_12" data-xid="Gd7Hsc" data-sfc-cp="" jsaction="aimRenderComplete:&amp;paZN7d_12|FJEdde;rcuQ6b:&amp;paZN7d_12|npT2md" jscontroller="a5f0he" data-sfc-root="c" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="DBd2Wb" jsmodel="Qdu94e" data-complete="true" data-processed="true">
<div class="zkL70c" data-processed="true">
<div jsuid="paZN7d_14" class="RkJvxe" jsaction="rcuQ6b:&amp;paZN7d_14|npT2md" jscontroller="RU9mjc" data-sfc-root="c" data-wiz-uids="paZN7d_15" data-sfc-cb="" data-complete="true" data-processed="true">
<div jsuid="paZN7d_16" class="YHsVn" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_16|npT2md" jscontroller="nqTR2b" data-sfc-root="c" data-wiz-uids="paZN7d_17,paZN7d_18" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="" data-processed="true">
<p>03 September to 18 September 2026</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>: Tom Dell &ndash; Building Fabric Surveyor</p>
<p><strong>Mobile</strong>: &nbsp; 07895 331 871</p>
<p><strong>Email</strong>: &nbsp;t.dell@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/pilkington-library-030---installation-of-microwave-station-0309-18092026-.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/pilkington-library-030---installation-of-microwave-station-0309-18092026-.html</guid>
<pubDate>Wed, 26 Aug 2026 11:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Village Dining New Boiler System Installation - 24/08/2026 (for six weeks)

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Works are to take place on AHU_1 which serves the main restaurant space of Village Dining alongside AHU_2. During this time only AHU_2 will be operational.</p>
<p>The heating burner to AHU_1 was replaced with a LTHW coil last year, a new LTHW boiler system is to be installed to serve the new heating coil to AHU_1. (AHU_2 remains as existing direct gas fired).</p>
<p>The new boiler system will include the installation of 2No. 100kW boilers, these will serve as resilience and futureproof the installation for AHU_2 future requirements. A new common flue will be installed to serve the boilers and pipework with spare future connections for AHU_2 to be connected later if/when required. The new system will be connected to the local control panel with new sensors to the pipework and AHU_1 ductwork sections to allow BMS integration control.</p>
<p>The existing run around coil pipework serving AHU_2 is to be altered to make space for the new boiler system including secondary and ancillary equipment. New valves and pipework will be installed to join the R-A-C pipework of AHU_2 to AHU_1 to allow the quick fill loop of AHU_1 to be used to fill both systems, the valves will be left closed under normal operation.</p>
<p><strong>TIMESCALE</strong></p>
<p>Commencing Monday 24 August 2026 for 6 weeks.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title: - Aaron Smart &ndash; Mechanical Building Services Engineer&nbsp;</p>
<p>Mobile: - 07989 420705</p>
<p>Email: - <a href="mailto:a.j.smart@lboro.ac.uk">a.j.smart@lboro.ac.uk</a></p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/village-dining-new-boiler-system-installation---24082026-for-six-weeks.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/village-dining-new-boiler-system-installation---24082026-for-six-weeks.html</guid>
<pubDate>Tue, 18 Aug 2026 10:30:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Sir John Beckwith (071), Brockington Extension (029) &amp; Morag Bell (009) - Interior Painting Works - 19th August -  18th September 2026 ]]></title>
<description><![CDATA[<h3>Description of the Works&nbsp;</h3>
<p>The university is carrying out interior redecoration works to various corridor floors, offices &amp; seminar rooms, as detailed below.</p>
<p>Sir John Beckwith (First floor)</p>
<p>Brockington Extension (Ground Floor)</p>
<p>Morag Bell (Ground Floor).</p>
<p>Please note that, during the immediate phase of the works, the affected areas may be partially or fully closed. Access may be temporarily restricted or compromised locally at certain times to facilitate the safe completion of the works.</p>
<p>For your safety, please observe and comply with all signage, barriers and safety notices displayed around the work area throughout the works period.</p>
<p>The Estates and Facilities Management team member responsible for the works is detailed below and can be contacted should you experience any difficulties or require assistance arising from the works..</p>
<p><strong>Timescale</strong></p>
<div jsuid="zDqeqe_3" class="qJYHHd mp0vvc" data-xid="aim-mars-turn-root" jsmodel="TqqUIc" data-asrc="true">
<div jsname="RH7zg" jsmodel="CPTaDd LUQCCe pRMv2d" data-tr-rsts="false" class="tonYlb Uphzyf" data-sfc-cp="" jsaction="" jscontroller="ZA09ef" data-sfc-root="c" jsuid="zDqeqe_4e" data-wiz-uids="zDqeqe_4f" data-sfc-cb="" data-streaming-container="" eid="f3XXafSwGa2dhbIPk5iesQ0">
<div data-processed="true">
<div class="CKgc1d" data-scope-id="turn" jsname="CS7uPe" jsmodel="p9hQFe CPTaDd LUQCCe wuVnCd pRMv2d" jsaction="" jscontroller="uUCgYd" data-sfc-root="c" jsuid="paZN7d_0" data-sfc-cb="" data-processed="true" data-complete="true">
<div data-subtree="aimc" decode-data-ved="1" data-sfc-cp="" jsaction="" jscontroller="v48bt" data-sfc-root="c" jsuid="paZN7d_2" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ2O0OegYIAQgAEAA" data-hveid="CAEIABAA" data-processed="true" data-complete="true">
<div jsuid="paZN7d_1" class="Zkbeff" jsaction="rcuQ6b:&amp;paZN7d_1|npT2md" jscontroller="nfCumd" data-sfc-root="c" data-wiz-uids="paZN7d_3" data-sfc-cb="" data-processed="true" data-complete="true">
<div class="pWvJNd" jsaction="" jscontroller="zp3Dsd" data-sfc-root="c" jsuid="paZN7d_4" data-sfc-cb="" data-processed="true" data-complete="true">
<div jsuid="paZN7d_5" dir="ltr" data-container-id="main-col" data-xid="VpUvz" jsname="KFl8ub" class="mZJni Dn7Fzd" jsaction="" jscontroller="Aoijq" data-sfc-root="c" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ3KYQegYIAQgAEAE" data-processed="true">
<div jsuid="paZN7d_12" data-xid="Gd7Hsc" data-sfc-cp="" jsaction="aimRenderComplete:&amp;paZN7d_12|FJEdde;rcuQ6b:&amp;paZN7d_12|npT2md" jscontroller="a5f0he" data-sfc-root="c" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="DBd2Wb" jsmodel="Qdu94e" data-complete="true" data-processed="true">
<div class="zkL70c" data-processed="true">
<div jsuid="paZN7d_14" class="RkJvxe" jsaction="rcuQ6b:&amp;paZN7d_14|npT2md" jscontroller="RU9mjc" data-sfc-root="c" data-wiz-uids="paZN7d_15" data-sfc-cb="" data-complete="true" data-processed="true">
<div jsuid="paZN7d_16" class="YHsVn" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_16|npT2md" jscontroller="nqTR2b" data-sfc-root="c" data-wiz-uids="paZN7d_17,paZN7d_18" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="" data-processed="true">
<p>Planned works 19<sup>th</sup> August 2026 (duration 4weeks)</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>:&nbsp;Tom Dell, Building Fabric Surveyor</p>
<p><strong>Mobile</strong>: 07895331871</p>
<p><strong>Email</strong>: &nbsp;T.Dell@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/sir-john-beckwith-brockington-extension--morag-bell---interior-painting.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/sir-john-beckwith-brockington-extension--morag-bell---interior-painting.html</guid>
<pubDate>Fri, 14 Aug 2026 14:20:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Fire Door Inspection- Multiple Buildings - 13/8/26 to 30/10/26. ]]></title>
<description><![CDATA[<h3>Description of the Works&nbsp;</h3>
<p><strong>WHY DOES THE WORK NEEED TO BE DONE</strong></p>
<p>The work needs to be done to ensure fire safety compliance within university buildings</p>
<p>624 - Energy and Data Hub</p>
<p>206 - Bridgeman Building</p>
<p>210 - NCSEM</p>
<p>216 - Holywell Fitness Centre</p>
<p>217 - WPTH</p>
<p>219 - STEM</p>
<p>224 - Towers Dining</p>
<p>380 - LSU</p>
<p>400 - University House (Imago)</p>
<p>432 - Village Restaurant/Elvyn Dining</p>
<p>467 - Faraday Royce Dining</p>
<p>519 - Cayley Rutherford Dining</p>
<p>625 - William Morris / Student</p>
<p>626 - William Morris Nursery/Learning</p>
<p>&nbsp;</p>
<p><strong>HOW WILL THE WORKS AFFECT ME?</strong></p>
<p>The RLB Contractors will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to receptions where applicable prior to carrying out the inspections in each building.</p>
<p><strong>Timescale</strong></p>
<div jsuid="zDqeqe_3" class="qJYHHd mp0vvc" data-xid="aim-mars-turn-root" jsmodel="TqqUIc" data-asrc="true">
<div jsname="RH7zg" jsmodel="CPTaDd LUQCCe pRMv2d" data-tr-rsts="false" class="tonYlb Uphzyf" data-sfc-cp="" jsaction="" jscontroller="ZA09ef" data-sfc-root="c" jsuid="zDqeqe_4e" data-wiz-uids="zDqeqe_4f" data-sfc-cb="" data-streaming-container="" eid="f3XXafSwGa2dhbIPk5iesQ0">
<div data-processed="true">
<div class="CKgc1d" data-scope-id="turn" jsname="CS7uPe" jsmodel="p9hQFe CPTaDd LUQCCe wuVnCd pRMv2d" jsaction="" jscontroller="uUCgYd" data-sfc-root="c" jsuid="paZN7d_0" data-sfc-cb="" data-processed="true" data-complete="true">
<div data-subtree="aimc" decode-data-ved="1" data-sfc-cp="" jsaction="" jscontroller="v48bt" data-sfc-root="c" jsuid="paZN7d_2" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ2O0OegYIAQgAEAA" data-hveid="CAEIABAA" data-processed="true" data-complete="true">
<div jsuid="paZN7d_1" class="Zkbeff" jsaction="rcuQ6b:&amp;paZN7d_1|npT2md" jscontroller="nfCumd" data-sfc-root="c" data-wiz-uids="paZN7d_3" data-sfc-cb="" data-processed="true" data-complete="true">
<div class="pWvJNd" jsaction="" jscontroller="zp3Dsd" data-sfc-root="c" jsuid="paZN7d_4" data-sfc-cb="" data-processed="true" data-complete="true">
<div jsuid="paZN7d_5" dir="ltr" data-container-id="main-col" data-xid="VpUvz" jsname="KFl8ub" class="mZJni Dn7Fzd" jsaction="" jscontroller="Aoijq" data-sfc-root="c" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ3KYQegYIAQgAEAE" data-processed="true">
<div jsuid="paZN7d_12" data-xid="Gd7Hsc" data-sfc-cp="" jsaction="aimRenderComplete:&amp;paZN7d_12|FJEdde;rcuQ6b:&amp;paZN7d_12|npT2md" jscontroller="a5f0he" data-sfc-root="c" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="DBd2Wb" jsmodel="Qdu94e" data-complete="true" data-processed="true">
<div class="zkL70c" data-processed="true">
<div jsuid="paZN7d_14" class="RkJvxe" jsaction="rcuQ6b:&amp;paZN7d_14|npT2md" jscontroller="RU9mjc" data-sfc-root="c" data-wiz-uids="paZN7d_15" data-sfc-cb="" data-complete="true" data-processed="true">
<div jsuid="paZN7d_16" class="YHsVn" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_16|npT2md" jscontroller="nqTR2b" data-sfc-root="c" data-wiz-uids="paZN7d_17,paZN7d_18" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="" data-processed="true">
<p>From 13/8/26 to 30/10/26 Fire doors inspections will take place in the buildings above between, 9.00am -5.00pm.</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>: Rod Harrison - Fire Compliance Contract Supervisor</p>
<p><strong>Mobile</strong>: 07729080155</p>
<p><strong>Email</strong>: &nbsp;<a href="mailto:r.m.harrison@lboro.ac.uk">r.m.harrison@lboro.ac.uk</a></p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--multiple-buildings---13826-to-301026-.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--multiple-buildings---13826-to-301026-.html</guid>
<pubDate>Wed, 12 Aug 2026 10:45:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Fire Door Inspection- Multiple Buildings - 6/8/26 to 30/10/26. ]]></title>
<description><![CDATA[<h3>Description of the Works&nbsp;</h3>
<p><strong>WHY DOES THE WORK NEEED TO BE DONE</strong></p>
<p>469 &ndash; Royce</p>
<p>053 &ndash; Burleigh Court&nbsp;</p>
<p><strong>HOW WILL THE WORKS AFFECT ME?</strong></p>
<p>The RLB Contractors will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to receptions where applicable prior to carrying out the inspections in each building.</p>
<p><strong>Timescale</strong></p>
<div jsuid="zDqeqe_3" class="qJYHHd mp0vvc" data-xid="aim-mars-turn-root" jsmodel="TqqUIc" data-asrc="true">
<div jsname="RH7zg" jsmodel="CPTaDd LUQCCe pRMv2d" data-tr-rsts="false" class="tonYlb Uphzyf" data-sfc-cp="" jsaction="" jscontroller="ZA09ef" data-sfc-root="c" jsuid="zDqeqe_4e" data-wiz-uids="zDqeqe_4f" data-sfc-cb="" data-streaming-container="" eid="f3XXafSwGa2dhbIPk5iesQ0">
<div data-processed="true">
<div class="CKgc1d" data-scope-id="turn" jsname="CS7uPe" jsmodel="p9hQFe CPTaDd LUQCCe wuVnCd pRMv2d" jsaction="" jscontroller="uUCgYd" data-sfc-root="c" jsuid="paZN7d_0" data-sfc-cb="" data-processed="true" data-complete="true">
<div data-subtree="aimc" decode-data-ved="1" data-sfc-cp="" jsaction="" jscontroller="v48bt" data-sfc-root="c" jsuid="paZN7d_2" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ2O0OegYIAQgAEAA" data-hveid="CAEIABAA" data-processed="true" data-complete="true">
<div jsuid="paZN7d_1" class="Zkbeff" jsaction="rcuQ6b:&amp;paZN7d_1|npT2md" jscontroller="nfCumd" data-sfc-root="c" data-wiz-uids="paZN7d_3" data-sfc-cb="" data-processed="true" data-complete="true">
<div class="pWvJNd" jsaction="" jscontroller="zp3Dsd" data-sfc-root="c" jsuid="paZN7d_4" data-sfc-cb="" data-processed="true" data-complete="true">
<div jsuid="paZN7d_5" dir="ltr" data-container-id="main-col" data-xid="VpUvz" jsname="KFl8ub" class="mZJni Dn7Fzd" jsaction="" jscontroller="Aoijq" data-sfc-root="c" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ3KYQegYIAQgAEAE" data-processed="true">
<div jsuid="paZN7d_12" data-xid="Gd7Hsc" data-sfc-cp="" jsaction="aimRenderComplete:&amp;paZN7d_12|FJEdde;rcuQ6b:&amp;paZN7d_12|npT2md" jscontroller="a5f0he" data-sfc-root="c" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="DBd2Wb" jsmodel="Qdu94e" data-complete="true" data-processed="true">
<div class="zkL70c" data-processed="true">
<div jsuid="paZN7d_14" class="RkJvxe" jsaction="rcuQ6b:&amp;paZN7d_14|npT2md" jscontroller="RU9mjc" data-sfc-root="c" data-wiz-uids="paZN7d_15" data-sfc-cb="" data-complete="true" data-processed="true">
<div jsuid="paZN7d_16" class="YHsVn" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_16|npT2md" jscontroller="nqTR2b" data-sfc-root="c" data-wiz-uids="paZN7d_17,paZN7d_18" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="" data-processed="true">
<p>From 6/8/26 to 30/10/26 Fire doors inspections will take place in the buildings above between, 9.00am -5.00pm.</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>: Rod Harrison - Fire Compliance Contract Supervisor</p>
<p><strong>Mobile</strong>: 07729080155</p>
<p><strong>Email</strong>: &nbsp;<a href="mailto:r.m.harrison@lboro.ac.uk">r.m.harrison@lboro.ac.uk</a></p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--multiple-buildings---6826-to-301026-.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--multiple-buildings---6826-to-301026-.html</guid>
<pubDate>Wed, 05 Aug 2026 10:45:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Fire Door Inspection- Multiple Buildings - 6/8/26 to 30/10/26. ]]></title>
<description><![CDATA[<h3>Description of the Works&nbsp;</h3>
<p><strong>WHY DOES THE WORK NEEED TO BE DONE</strong></p>
<p>The work needs to be done to ensure fire safety compliance within university buildings.</p>
<p>088 &ndash; Haselgrave Pavilion</p>
<p>090 &ndash; Paul Radcliffe Pavilion</p>
<p>119 &ndash; Campus Living Offices</p>
<p>120 &ndash; Martial Arts Studio</p>
<p>124 &ndash; 7 Holywell Drive</p>
<p>200 &ndash; ºìÐÓÊÓÆµ Design School</p>
<p>201 &ndash; Hazlerigg</p>
<p>203 &ndash; Rutland</p>
<p>205 &ndash; LU Stadium</p>
<p><strong>HOW WILL THE WORKS AFFECT ME?</strong></p>
<p>The RLB Contractors will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to receptions where applicable prior to carrying out the inspections in each building.</p>
<p><strong>Timescale</strong></p>
<div jsuid="zDqeqe_3" class="qJYHHd mp0vvc" data-xid="aim-mars-turn-root" jsmodel="TqqUIc" data-asrc="true">
<div jsname="RH7zg" jsmodel="CPTaDd LUQCCe pRMv2d" data-tr-rsts="false" class="tonYlb Uphzyf" data-sfc-cp="" jsaction="" jscontroller="ZA09ef" data-sfc-root="c" jsuid="zDqeqe_4e" data-wiz-uids="zDqeqe_4f" data-sfc-cb="" data-streaming-container="" eid="f3XXafSwGa2dhbIPk5iesQ0">
<div data-processed="true">
<div class="CKgc1d" data-scope-id="turn" jsname="CS7uPe" jsmodel="p9hQFe CPTaDd LUQCCe wuVnCd pRMv2d" jsaction="" jscontroller="uUCgYd" data-sfc-root="c" jsuid="paZN7d_0" data-sfc-cb="" data-processed="true" data-complete="true">
<div data-subtree="aimc" decode-data-ved="1" data-sfc-cp="" jsaction="" jscontroller="v48bt" data-sfc-root="c" jsuid="paZN7d_2" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ2O0OegYIAQgAEAA" data-hveid="CAEIABAA" data-processed="true" data-complete="true">
<div jsuid="paZN7d_1" class="Zkbeff" jsaction="rcuQ6b:&amp;paZN7d_1|npT2md" jscontroller="nfCumd" data-sfc-root="c" data-wiz-uids="paZN7d_3" data-sfc-cb="" data-processed="true" data-complete="true">
<div class="pWvJNd" jsaction="" jscontroller="zp3Dsd" data-sfc-root="c" jsuid="paZN7d_4" data-sfc-cb="" data-processed="true" data-complete="true">
<div jsuid="paZN7d_5" dir="ltr" data-container-id="main-col" data-xid="VpUvz" jsname="KFl8ub" class="mZJni Dn7Fzd" jsaction="" jscontroller="Aoijq" data-sfc-root="c" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ3KYQegYIAQgAEAE" data-processed="true">
<div jsuid="paZN7d_12" data-xid="Gd7Hsc" data-sfc-cp="" jsaction="aimRenderComplete:&amp;paZN7d_12|FJEdde;rcuQ6b:&amp;paZN7d_12|npT2md" jscontroller="a5f0he" data-sfc-root="c" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="DBd2Wb" jsmodel="Qdu94e" data-complete="true" data-processed="true">
<div class="zkL70c" data-processed="true">
<div jsuid="paZN7d_14" class="RkJvxe" jsaction="rcuQ6b:&amp;paZN7d_14|npT2md" jscontroller="RU9mjc" data-sfc-root="c" data-wiz-uids="paZN7d_15" data-sfc-cb="" data-complete="true" data-processed="true">
<div jsuid="paZN7d_16" class="YHsVn" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_16|npT2md" jscontroller="nqTR2b" data-sfc-root="c" data-wiz-uids="paZN7d_17,paZN7d_18" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="" data-processed="true">
<p>From 6/8/26 to 30/10/26 Fire doors inspections will take place in the buildings above between, 9.00am -5.00pm.</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>: Rod Harrison - Fire Compliance Contract Supervisor</p>
<p><strong>Mobile</strong>: 07729080155</p>
<p><strong>Email</strong>: &nbsp;<a href="mailto:r.m.harrison@lboro.ac.uk">r.m.harrison@lboro.ac.uk</a></p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--multiple-buildings---6826-to-301026--1.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--multiple-buildings---6826-to-301026--1.html</guid>
<pubDate>Wed, 05 Aug 2026 10:35:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Fire Door Inspection- Multiple Buildings - 6/8/26 to 30/10/26. ]]></title>
<description><![CDATA[<h3>Description of the Works&nbsp;</h3>
<p><strong>WHY DOES THE WORK NEEED TO BE DONE</strong></p>
<p>The work needs to be done to ensure fire safety compliance within university buildings.</p>
<p>Hockey Pavilion (075)</p>
<p>Stewart Mason (076)</p>
<p>Keith Green (077)</p>
<p>Clyde Williams (080)</p>
<p>11 Holywell Drive (084)</p>
<p><strong>HOW WILL THE WORKS AFFECT ME?</strong></p>
<p>The RLB Contractors will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to receptions where applicable prior to carrying out the inspections in each building.</p>
<p><strong>Timescale</strong></p>
<div jsuid="zDqeqe_3" class="qJYHHd mp0vvc" data-xid="aim-mars-turn-root" jsmodel="TqqUIc" data-asrc="true">
<div jsname="RH7zg" jsmodel="CPTaDd LUQCCe pRMv2d" data-tr-rsts="false" class="tonYlb Uphzyf" data-sfc-cp="" jsaction="" jscontroller="ZA09ef" data-sfc-root="c" jsuid="zDqeqe_4e" data-wiz-uids="zDqeqe_4f" data-sfc-cb="" data-streaming-container="" eid="f3XXafSwGa2dhbIPk5iesQ0">
<div data-processed="true">
<div class="CKgc1d" data-scope-id="turn" jsname="CS7uPe" jsmodel="p9hQFe CPTaDd LUQCCe wuVnCd pRMv2d" jsaction="" jscontroller="uUCgYd" data-sfc-root="c" jsuid="paZN7d_0" data-sfc-cb="" data-processed="true" data-complete="true">
<div data-subtree="aimc" decode-data-ved="1" data-sfc-cp="" jsaction="" jscontroller="v48bt" data-sfc-root="c" jsuid="paZN7d_2" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ2O0OegYIAQgAEAA" data-hveid="CAEIABAA" data-processed="true" data-complete="true">
<div jsuid="paZN7d_1" class="Zkbeff" jsaction="rcuQ6b:&amp;paZN7d_1|npT2md" jscontroller="nfCumd" data-sfc-root="c" data-wiz-uids="paZN7d_3" data-sfc-cb="" data-processed="true" data-complete="true">
<div class="pWvJNd" jsaction="" jscontroller="zp3Dsd" data-sfc-root="c" jsuid="paZN7d_4" data-sfc-cb="" data-processed="true" data-complete="true">
<div jsuid="paZN7d_5" dir="ltr" data-container-id="main-col" data-xid="VpUvz" jsname="KFl8ub" class="mZJni Dn7Fzd" jsaction="" jscontroller="Aoijq" data-sfc-root="c" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ3KYQegYIAQgAEAE" data-processed="true">
<div jsuid="paZN7d_12" data-xid="Gd7Hsc" data-sfc-cp="" jsaction="aimRenderComplete:&amp;paZN7d_12|FJEdde;rcuQ6b:&amp;paZN7d_12|npT2md" jscontroller="a5f0he" data-sfc-root="c" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="DBd2Wb" jsmodel="Qdu94e" data-complete="true" data-processed="true">
<div class="zkL70c" data-processed="true">
<div jsuid="paZN7d_14" class="RkJvxe" jsaction="rcuQ6b:&amp;paZN7d_14|npT2md" jscontroller="RU9mjc" data-sfc-root="c" data-wiz-uids="paZN7d_15" data-sfc-cb="" data-complete="true" data-processed="true">
<div jsuid="paZN7d_16" class="YHsVn" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_16|npT2md" jscontroller="nqTR2b" data-sfc-root="c" data-wiz-uids="paZN7d_17,paZN7d_18" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="" data-processed="true">
<p>From 6/8/26 to 30/10/26 Fire doors inspections will take place in the buildings above between, 9.00am -5.00pm.</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>: Rod Harrison - Fire Compliance Contract Supervisor</p>
<p><strong>Mobile</strong>: 07729080155</p>
<p><strong>Email</strong>: &nbsp;<a href="mailto:r.m.harrison@lboro.ac.uk">r.m.harrison@lboro.ac.uk</a></p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--multiple-buildings---6826-to-301026--2.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--multiple-buildings---6826-to-301026--2.html</guid>
<pubDate>Wed, 05 Aug 2026 09:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Multiple Buildings - AccessAble Annual Buildings Re-Survey &ndash; 20th to 31st July 2026.]]></title>
<description><![CDATA[<h3>Description of the Works&nbsp;</h3>
<p>Two surveyors will be onsite at the locations listed below during the advised period to survey external access changes to update the live AccessAble app. The work will not cause any disruption to normal activities. Both surveyors have completed the required LU induction and will be wearing both LU and AccessAble ID badges.</p>
<p>Angela Marmont/Graduate House (017)</p>
<p>Bridgeman Building (206)</p>
<p>Claudia Parsons (Collectively)</p>
<p>James France (006)</p>
<p>Sir David Davies (032)</p>
<p>Morag Bell (009)</p>
<p>GG Block (052)</p>
<p>Harry French (Collectively)</p>
<p>Graham Dilley Pavilion (204)</p>
<p>Hockey Pavilion (075)</p>
<p>ºìÐÓÊÓÆµ Students Union (380)</p>
<p>ºìÐÓÊÓÆµ Stadium (205)&nbsp;</p>
<p>Netball/Badminton (073)</p>
<p>Pilkington Library (030)</p>
<p>Kiosk/Purple Onion (651)</p>
<p>Keith Green Building (077)</p>
<p>S Building (021)</p>
<p>Seb Coe HIPAC (074)</p>
<p>ECB <span>Sir John Ferguson (022)</span></p>
<p>Sir Richard Morris/Business School (069)</p>
<p>Dan Maskell Tennis/Squash Centre (063/072)</p>
<p><strong>Timescale</strong></p>
<div jsuid="zDqeqe_3" class="qJYHHd mp0vvc" data-xid="aim-mars-turn-root" jsmodel="TqqUIc" data-asrc="true">
<div jsname="RH7zg" jsmodel="CPTaDd LUQCCe pRMv2d" data-tr-rsts="false" class="tonYlb Uphzyf" data-sfc-cp="" jsaction="" jscontroller="ZA09ef" data-sfc-root="c" jsuid="zDqeqe_4e" data-wiz-uids="zDqeqe_4f" data-sfc-cb="" data-streaming-container="" eid="f3XXafSwGa2dhbIPk5iesQ0">
<div data-processed="true">
<div class="CKgc1d" data-scope-id="turn" jsname="CS7uPe" jsmodel="p9hQFe CPTaDd LUQCCe wuVnCd pRMv2d" jsaction="" jscontroller="uUCgYd" data-sfc-root="c" jsuid="paZN7d_0" data-sfc-cb="" data-processed="true" data-complete="true">
<div data-subtree="aimc" decode-data-ved="1" data-sfc-cp="" jsaction="" jscontroller="v48bt" data-sfc-root="c" jsuid="paZN7d_2" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ2O0OegYIAQgAEAA" data-hveid="CAEIABAA" data-processed="true" data-complete="true">
<div jsuid="paZN7d_1" class="Zkbeff" jsaction="rcuQ6b:&amp;paZN7d_1|npT2md" jscontroller="nfCumd" data-sfc-root="c" data-wiz-uids="paZN7d_3" data-sfc-cb="" data-processed="true" data-complete="true">
<div class="pWvJNd" jsaction="" jscontroller="zp3Dsd" data-sfc-root="c" jsuid="paZN7d_4" data-sfc-cb="" data-processed="true" data-complete="true">
<div jsuid="paZN7d_5" dir="ltr" data-container-id="main-col" data-xid="VpUvz" jsname="KFl8ub" class="mZJni Dn7Fzd" jsaction="" jscontroller="Aoijq" data-sfc-root="c" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ3KYQegYIAQgAEAE" data-processed="true">
<div jsuid="paZN7d_12" data-xid="Gd7Hsc" data-sfc-cp="" jsaction="aimRenderComplete:&amp;paZN7d_12|FJEdde;rcuQ6b:&amp;paZN7d_12|npT2md" jscontroller="a5f0he" data-sfc-root="c" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="DBd2Wb" jsmodel="Qdu94e" data-complete="true" data-processed="true">
<div class="zkL70c" data-processed="true">
<div jsuid="paZN7d_14" class="RkJvxe" jsaction="rcuQ6b:&amp;paZN7d_14|npT2md" jscontroller="RU9mjc" data-sfc-root="c" data-wiz-uids="paZN7d_15" data-sfc-cb="" data-complete="true" data-processed="true">
<div jsuid="paZN7d_16" class="YHsVn" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_16|npT2md" jscontroller="nqTR2b" data-sfc-root="c" data-wiz-uids="paZN7d_17,paZN7d_18" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="" data-processed="true">
<p>Works commence on Monday 20<sup>th</sup> July and will be completed on Friday 31<sup>st</sup> July 2026.</p>
<p>Working hours are 09:00 17:30 daily</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>:&nbsp;Martin Channell &ndash; Assistant Director Capital Projects/Programme Management</p>
<p><strong>Mobile</strong>: 07971 323568</p>
<p><strong>Email</strong>: &nbsp;M.V.Channell@lboro.ac.uk.</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/multiple-buildings---accessable-annual-buildings-re-survey--20th-31st-july-26.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/multiple-buildings---accessable-annual-buildings-re-survey--20th-31st-july-26.html</guid>
<pubDate>Fri, 17 Jul 2026 14:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Fire Door Inspection- Multiple Buildings - 1st August - 30th October 2026]]></title>
<description><![CDATA[<h3>Description of the Works&nbsp;</h3>
<p><strong>WHY DOES THE WORK NEEED TO BE DONE</strong></p>
<p>The work needs to be done to ensure fire safety compliance within university buildings</p>
<p>050 &ndash; Wolfson Annex</p>
<p>052 &ndash; GG Block</p>
<p>054 &ndash; Matthew Arnold</p>
<p>062 &ndash; Security Gatehouse</p>
<p>063 &ndash; Dan Maskell Tennis Centre</p>
<p>066 &ndash; Stewart Miller</p>
<p>068 &ndash; Sir David Wallce</p>
<p>070 &ndash; Swimming Pool</p>
<p>071 &ndash; Sir John Beckworth</p>
<p>072 &ndash; LTA Tennis Centre</p>
<p>074 &ndash; Seb Coe HIPAC</p>
<p><strong>&nbsp;</strong></p>
<p><strong>HOW WILL THE WORKS AFFECT ME?</strong></p>
<p>The RLB Contractors will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to receptions where applicable prior to carrying out the inspections in each building.</p>
<p><strong>Timescale</strong></p>
<div jsuid="zDqeqe_3" class="qJYHHd mp0vvc" data-xid="aim-mars-turn-root" jsmodel="TqqUIc" data-asrc="true">
<div jsname="RH7zg" jsmodel="CPTaDd LUQCCe pRMv2d" data-tr-rsts="false" class="tonYlb Uphzyf" data-sfc-cp="" jsaction="" jscontroller="ZA09ef" data-sfc-root="c" jsuid="zDqeqe_4e" data-wiz-uids="zDqeqe_4f" data-sfc-cb="" data-streaming-container="" eid="f3XXafSwGa2dhbIPk5iesQ0">
<div data-processed="true">
<div class="CKgc1d" data-scope-id="turn" jsname="CS7uPe" jsmodel="p9hQFe CPTaDd LUQCCe wuVnCd pRMv2d" jsaction="" jscontroller="uUCgYd" data-sfc-root="c" jsuid="paZN7d_0" data-sfc-cb="" data-processed="true" data-complete="true">
<div data-subtree="aimc" decode-data-ved="1" data-sfc-cp="" jsaction="" jscontroller="v48bt" data-sfc-root="c" jsuid="paZN7d_2" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ2O0OegYIAQgAEAA" data-hveid="CAEIABAA" data-processed="true" data-complete="true">
<div jsuid="paZN7d_1" class="Zkbeff" jsaction="rcuQ6b:&amp;paZN7d_1|npT2md" jscontroller="nfCumd" data-sfc-root="c" data-wiz-uids="paZN7d_3" data-sfc-cb="" data-processed="true" data-complete="true">
<div class="pWvJNd" jsaction="" jscontroller="zp3Dsd" data-sfc-root="c" jsuid="paZN7d_4" data-sfc-cb="" data-processed="true" data-complete="true">
<div jsuid="paZN7d_5" dir="ltr" data-container-id="main-col" data-xid="VpUvz" jsname="KFl8ub" class="mZJni Dn7Fzd" jsaction="" jscontroller="Aoijq" data-sfc-root="c" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ3KYQegYIAQgAEAE" data-processed="true">
<div jsuid="paZN7d_12" data-xid="Gd7Hsc" data-sfc-cp="" jsaction="aimRenderComplete:&amp;paZN7d_12|FJEdde;rcuQ6b:&amp;paZN7d_12|npT2md" jscontroller="a5f0he" data-sfc-root="c" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="DBd2Wb" jsmodel="Qdu94e" data-complete="true" data-processed="true">
<div class="zkL70c" data-processed="true">
<div jsuid="paZN7d_14" class="RkJvxe" jsaction="rcuQ6b:&amp;paZN7d_14|npT2md" jscontroller="RU9mjc" data-sfc-root="c" data-wiz-uids="paZN7d_15" data-sfc-cb="" data-complete="true" data-processed="true">
<div jsuid="paZN7d_16" class="YHsVn" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_16|npT2md" jscontroller="nqTR2b" data-sfc-root="c" data-wiz-uids="paZN7d_17,paZN7d_18" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="" data-processed="true">
<p>From 1/8/26 to 30/10/26 Fire doors inspections will take place in the buildings above between, 9.00am -5.00pm.</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>: Rod Harrison - Fire Compliance Contract Supervisor</p>
<p><strong>Mobile</strong>: 07729080155</p>
<p><strong>Email</strong>: &nbsp;<a href="mailto:r.m.harrison@lboro.ac.uk">r.m.harrison@lboro.ac.uk</a></p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--multiple-buildings--01082026---30102026-.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--multiple-buildings--01082026---30102026-.html</guid>
<pubDate>Thu, 16 Jul 2026 11:30:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[E&amp;FM Yard (051-near Woodwork Shop) - Gents Toilet Refurbishment Works - 10th August 2026 (duration six weeks).]]></title>
<description><![CDATA[<h3>Description of the Works&nbsp;</h3>
<p>The university has employed a local building contractor to complete refurbishment works in the Gents Toilets.</p>
<p><strong>Timescale</strong></p>
<div jsuid="zDqeqe_3" class="qJYHHd mp0vvc" data-xid="aim-mars-turn-root" jsmodel="TqqUIc" data-asrc="true">
<div jsname="RH7zg" jsmodel="CPTaDd LUQCCe pRMv2d" data-tr-rsts="false" class="tonYlb Uphzyf" data-sfc-cp="" jsaction="" jscontroller="ZA09ef" data-sfc-root="c" jsuid="zDqeqe_4e" data-wiz-uids="zDqeqe_4f" data-sfc-cb="" data-streaming-container="" eid="f3XXafSwGa2dhbIPk5iesQ0">
<div data-processed="true">
<div class="CKgc1d" data-scope-id="turn" jsname="CS7uPe" jsmodel="p9hQFe CPTaDd LUQCCe wuVnCd pRMv2d" jsaction="" jscontroller="uUCgYd" data-sfc-root="c" jsuid="paZN7d_0" data-sfc-cb="" data-processed="true" data-complete="true">
<div data-subtree="aimc" decode-data-ved="1" data-sfc-cp="" jsaction="" jscontroller="v48bt" data-sfc-root="c" jsuid="paZN7d_2" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ2O0OegYIAQgAEAA" data-hveid="CAEIABAA" data-processed="true" data-complete="true">
<div jsuid="paZN7d_1" class="Zkbeff" jsaction="rcuQ6b:&amp;paZN7d_1|npT2md" jscontroller="nfCumd" data-sfc-root="c" data-wiz-uids="paZN7d_3" data-sfc-cb="" data-processed="true" data-complete="true">
<div class="pWvJNd" jsaction="" jscontroller="zp3Dsd" data-sfc-root="c" jsuid="paZN7d_4" data-sfc-cb="" data-processed="true" data-complete="true">
<div jsuid="paZN7d_5" dir="ltr" data-container-id="main-col" data-xid="VpUvz" jsname="KFl8ub" class="mZJni Dn7Fzd" jsaction="" jscontroller="Aoijq" data-sfc-root="c" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ3KYQegYIAQgAEAE" data-processed="true">
<div jsuid="paZN7d_12" data-xid="Gd7Hsc" data-sfc-cp="" jsaction="aimRenderComplete:&amp;paZN7d_12|FJEdde;rcuQ6b:&amp;paZN7d_12|npT2md" jscontroller="a5f0he" data-sfc-root="c" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="DBd2Wb" jsmodel="Qdu94e" data-complete="true" data-processed="true">
<div class="zkL70c" data-processed="true">
<div jsuid="paZN7d_14" class="RkJvxe" jsaction="rcuQ6b:&amp;paZN7d_14|npT2md" jscontroller="RU9mjc" data-sfc-root="c" data-wiz-uids="paZN7d_15" data-sfc-cb="" data-complete="true" data-processed="true">
<div jsuid="paZN7d_16" class="YHsVn" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_16|npT2md" jscontroller="nqTR2b" data-sfc-root="c" data-wiz-uids="paZN7d_17,paZN7d_18" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="" data-processed="true">
<p>Planned works 10<sup>th</sup> August 2026 (duration six weeks).</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>: Spencer Aryeetey, Building Fabric Surveyor</p>
<p><strong>Mobile</strong>: 07977 004475</p>
<p><strong>Email</strong>: &nbsp;Email: s.aryeetey@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/efm-yard-by-woodwork-shop---gts-toilet-refurb-works---100826-six-weeks.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/efm-yard-by-woodwork-shop---gts-toilet-refurb-works---100826-six-weeks.html</guid>
<pubDate>Wed, 15 Jul 2026 15:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Pilkington Library/Level 2 (030) - Furniture Solution - 3rd August to 25th September 2026
]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Removal of Journals and bookcases to make way for an additional 88 student quiet study spaces including new carpet, new furniture with power and additional WiFi cover to the area.</p>
<p><strong>Timescale</strong></p>
<div jsuid="zDqeqe_3" class="qJYHHd mp0vvc" data-xid="aim-mars-turn-root" jsmodel="TqqUIc" data-asrc="true">
<div jsname="RH7zg" jsmodel="CPTaDd LUQCCe pRMv2d" data-tr-rsts="false" class="tonYlb Uphzyf" data-sfc-cp="" jsaction="" jscontroller="ZA09ef" data-sfc-root="c" jsuid="zDqeqe_4e" data-wiz-uids="zDqeqe_4f" data-sfc-cb="" data-streaming-container="" eid="f3XXafSwGa2dhbIPk5iesQ0">
<div data-processed="true">
<div class="CKgc1d" data-scope-id="turn" jsname="CS7uPe" jsmodel="p9hQFe CPTaDd LUQCCe wuVnCd pRMv2d" jsaction="" jscontroller="uUCgYd" data-sfc-root="c" jsuid="paZN7d_0" data-sfc-cb="" data-processed="true" data-complete="true">
<div data-subtree="aimc" decode-data-ved="1" data-sfc-cp="" jsaction="" jscontroller="v48bt" data-sfc-root="c" jsuid="paZN7d_2" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ2O0OegYIAQgAEAA" data-hveid="CAEIABAA" data-processed="true" data-complete="true">
<div jsuid="paZN7d_1" class="Zkbeff" jsaction="rcuQ6b:&amp;paZN7d_1|npT2md" jscontroller="nfCumd" data-sfc-root="c" data-wiz-uids="paZN7d_3" data-sfc-cb="" data-processed="true" data-complete="true">
<div class="pWvJNd" jsaction="" jscontroller="zp3Dsd" data-sfc-root="c" jsuid="paZN7d_4" data-sfc-cb="" data-processed="true" data-complete="true">
<div jsuid="paZN7d_5" dir="ltr" data-container-id="main-col" data-xid="VpUvz" jsname="KFl8ub" class="mZJni Dn7Fzd" jsaction="" jscontroller="Aoijq" data-sfc-root="c" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ3KYQegYIAQgAEAE" data-processed="true">
<div jsuid="paZN7d_12" data-xid="Gd7Hsc" data-sfc-cp="" jsaction="aimRenderComplete:&amp;paZN7d_12|FJEdde;rcuQ6b:&amp;paZN7d_12|npT2md" jscontroller="a5f0he" data-sfc-root="c" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="DBd2Wb" jsmodel="Qdu94e" data-complete="true" data-processed="true">
<div class="zkL70c" data-processed="true">
<div jsuid="paZN7d_14" class="RkJvxe" jsaction="rcuQ6b:&amp;paZN7d_14|npT2md" jscontroller="RU9mjc" data-sfc-root="c" data-wiz-uids="paZN7d_15" data-sfc-cb="" data-complete="true" data-processed="true">
<div jsuid="paZN7d_16" class="YHsVn" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_16|npT2md" jscontroller="nqTR2b" data-sfc-root="c" data-wiz-uids="paZN7d_17,paZN7d_18" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="" data-processed="true">
<p>Works commence on Monday 3<sup>rd</sup> August and will be completed on Thursday 24<sup>th</sup> September 2026.&nbsp;</p>
<p>No works will take place during Open Days - 18<sup>th</sup> &amp; 19<sup>th</sup> September 2026</p>
<p>Contractors working hours are 07:00-16:30 daily</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>: Tim Oakey - Project Manager</p>
<p><strong>Mobile</strong>: &nbsp; 07966 828356</p>
<p><strong>Email</strong>: &nbsp;t.s.oakey@lboro.ac.uk.</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/pilkington-library-030---furniture-solution---030826-250926.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/pilkington-library-030---furniture-solution---030826-250926.html</guid>
<pubDate>Mon, 06 Jul 2026 13:30:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Pilkington Library Loading Bay (030) - Roller Shutter Replacement - 8th-17th July 2026
]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Supply and installation of a face-fitted electrically operated steel rolling shutter door with motorised operation, safety features, galvanised finish, and manual override.</p>
<p><strong>Timescale</strong></p>
<div jsuid="zDqeqe_3" class="qJYHHd mp0vvc" data-xid="aim-mars-turn-root" jsmodel="TqqUIc" data-asrc="true">
<div jsname="RH7zg" jsmodel="CPTaDd LUQCCe pRMv2d" data-tr-rsts="false" class="tonYlb Uphzyf" data-sfc-cp="" jsaction="" jscontroller="ZA09ef" data-sfc-root="c" jsuid="zDqeqe_4e" data-wiz-uids="zDqeqe_4f" data-sfc-cb="" data-streaming-container="" eid="f3XXafSwGa2dhbIPk5iesQ0">
<div data-processed="true">
<div class="CKgc1d" data-scope-id="turn" jsname="CS7uPe" jsmodel="p9hQFe CPTaDd LUQCCe wuVnCd pRMv2d" jsaction="" jscontroller="uUCgYd" data-sfc-root="c" jsuid="paZN7d_0" data-sfc-cb="" data-processed="true" data-complete="true">
<div data-subtree="aimc" decode-data-ved="1" data-sfc-cp="" jsaction="" jscontroller="v48bt" data-sfc-root="c" jsuid="paZN7d_2" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ2O0OegYIAQgAEAA" data-hveid="CAEIABAA" data-processed="true" data-complete="true">
<div jsuid="paZN7d_1" class="Zkbeff" jsaction="rcuQ6b:&amp;paZN7d_1|npT2md" jscontroller="nfCumd" data-sfc-root="c" data-wiz-uids="paZN7d_3" data-sfc-cb="" data-processed="true" data-complete="true">
<div class="pWvJNd" jsaction="" jscontroller="zp3Dsd" data-sfc-root="c" jsuid="paZN7d_4" data-sfc-cb="" data-processed="true" data-complete="true">
<div jsuid="paZN7d_5" dir="ltr" data-container-id="main-col" data-xid="VpUvz" jsname="KFl8ub" class="mZJni Dn7Fzd" jsaction="" jscontroller="Aoijq" data-sfc-root="c" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ3KYQegYIAQgAEAE" data-processed="true">
<div jsuid="paZN7d_12" data-xid="Gd7Hsc" data-sfc-cp="" jsaction="aimRenderComplete:&amp;paZN7d_12|FJEdde;rcuQ6b:&amp;paZN7d_12|npT2md" jscontroller="a5f0he" data-sfc-root="c" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="DBd2Wb" jsmodel="Qdu94e" data-complete="true" data-processed="true">
<div class="zkL70c" data-processed="true">
<div jsuid="paZN7d_14" class="RkJvxe" jsaction="rcuQ6b:&amp;paZN7d_14|npT2md" jscontroller="RU9mjc" data-sfc-root="c" data-wiz-uids="paZN7d_15" data-sfc-cb="" data-complete="true" data-processed="true">
<div jsuid="paZN7d_16" class="YHsVn" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_16|npT2md" jscontroller="nqTR2b" data-sfc-root="c" data-wiz-uids="paZN7d_17,paZN7d_18" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="" data-processed="true">
<p>8th - 17th July 2026</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>: Tom Dell &ndash; Building Fabric Surveyor</p>
<p><strong>Mobile</strong>: &nbsp; 07895 331 871</p>
<p><strong>Email</strong>: &nbsp;t.dell@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/pilkington-library-030---roller-shutter-replacement---8th-17th-july-2026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/pilkington-library-030---roller-shutter-replacement---8th-17th-july-2026.html</guid>
<pubDate>Wed, 01 Jul 2026 12:00:00 GMT</pubDate>
</item>





